What is a CEQA addendum?

What is a CEQA addendum?

California Environmental Quality Act (CEQA), this Addendum analyzes proposed modifications (the Modified Project) to the New Century Plan Project approved in 2009, updated in 2014 through a Project Permit Modification and updated in 2016 through a Plan Approval (the Approved Project) and demonstrates that all of the …

What is a statement of overriding considerations in CEQA?

Section 15093 – Statement of Overriding Considerations (a) CEQA requires the decision-making agency to balance, as applicable, the economic, legal, social, technological, or other benefits, including region-wide or statewide environmental benefits, of a proposed project against its unavoidable environmental risks when …

What document must be issued within 30 days of the completion of the EIR?

The Notice of Availability shall be posted for a period of 30 days in the office of the county clerk in which the project will be located. PRC § 21092.2 requires notice of availability of a Draft EIR to be mailed to any person who has filed a written request for notification with the Lead Agency.

What is a Mitigated Negative Declaration CEQA?

A mitigated negative declaration (MND) is a negative declaration (ND) that incorporates revisions (mitigation measures) in the proposed project that will avoid or mitigate impacts to a point where clearly no significant impacts on the environment would occur.

What is an EIR addendum?

The purpose of an addendum is to make minor technical changes or additions to an adopted ND or a certified EIR. An addendum can only be used if none of the conditions that would trigger a subsequent environmental impact report or negative declaration is present.

What are CEQA findings?

The CEQA findings must disclose the final disposition of each of the significant impacts. identified in the final EIR. For purposes of the findings, “significant impacts” are the following: • Impacts found to be less than significant as a result of mitigation measures. • Impacts found to be significant and unavoidable.

What triggers CEQA review?

The CEQA process requires the public agency in charge of permitting the project, known as the “lead agency,” to conduct an environmental review. This review is pulled together in one document, either a negative declaration if no adverse impact is projected, or an environmental impact report.

What is a Notice of Preparation CEQA?

The Notice of Preparation (NOP) is an initial step to inform members of the public that an Environmental Impact Report (EIR) is going to be prepared.

How long is a negative declaration good for?

F. The Lead Agency shall provide a public review period of no less than 20 days. When a Negative 6 Page 10 Declaration or MND is submitted to the State Clearinghouse, the review period shall last no less than 30 days, unless a shorter period is approved.

What is a Notice of Intent to Adopt a Mitigated Negative Declaration?

This Notice of Intent to Adopt a Mitigated Negative Declaration (NOi) is to inform the public that the City has prepared an Initial Study to evaluate the potential environmental impacts of the proposed project Rendering Plant Project will not have a significant effect on the environment.

What is the difference between EIR and EIS?

An EIS is prepared when there is Federal involvement in the project and an EIR is prepared when the project is subject to State or local jurisdiction.